1.After installation, conduct a pressure test to check all connections for leaks. The test pressure is generally 1.5 times the system working pressure (refer to specific standards), and a burst pressure test must not be performed directly.
2.Hoses are wear prone parts;even if installed correctly, a regular inspection and mandatory replacement system must be established. Inspection frequency should be based on operating conditions (e.g., pulse pressure, vibration).
3.Immediate replacement is required if any of the following occurs: severe wear of the outer cover (exposing the reinforcement layer), bulging, coupling corrosion or leakage, or permanent deformation.